Q-IND PIPE TRACKING
ONLINE
Pipes in line0
In process0
Prime0
Hold0
Scrap0

Station cells: OK reject at station pending — click a row for the process log, pyrometry and piece actions.

Select a pipe

Pyrometry

No pipe selected.

EMI strip chart

No pipe selected.

UT wall thickness

No pipe selected.

Hydrotest

No pipe selected.

Piece summary

No pipe selected.

Process piece

Select a pipe first.

Live occupancy per tracking zone. Amber = pipe at station, red = hold rack. Click a piece to open it in Tracking.

Top view of the mill per the plant layout — pipes glow orange through quench & temper and cool down on the cooling bed. Dashed red pockets are hold racks. Hover a pipe for details, click to open it in Tracking. Run the simulation to watch them move.

Material genealogy: heat → coils → pipes. Click a pipe to open it in Tracking. You can also land here by clicking any Heat # cell in the Tracking table.

Production
Reject pareto

Simulated feeds — placeholders for the station vision system (stencil OCR / pipe presence).

Simulation

Pyrometry spec bands

Quench exit (°C)
Temper exit (°C)

Bands are redrawn on the pyrometry chart when a pipe is selected.

Visible column groups